SHR11 - ADVANCES IN THE SEISMIC HAZARD AND RISK ASSESSMENT OF NUCLEAR POWER PLANTS |
WEDNESDAY | ||||||||
AMBER 5 | Convenors: D. Vamvatsikos, P. Bazzurro, I. Zentner | ||||||||
09:00 - 09:09 | INTRODUCTION | |||||||
09:09 - 09:20 | METIS PROJECT: GEM'S CONTRIBUTIONS TO THE HAZARD WORK PACKAGE M. Pagani, R. Styron, M. Villani, K. Johnson, M. Simionato | |||||||
09:20 - 09:31 | FRAMEWORK TO INTRODUCE SITE RESPONSE IN SEISMIC RISK ASSESSMENT AND APPLICATION TO METIS CASE STUDY V. Alves Fernandes, M. Korres, I. Zentner | |||||||
09:31 - 09:42 | SIMULATION OF A SCENARIO DATABASE OF SYNTHETIC GROUND MOTIONS FOR SITE-SPECIFIC EARTHQUAKE RESPONSE L.G. Alvarez Sanchez, I. Zentner | |||||||
09:42 - 09:53 | IMPORTANCE OF HAZARD-CONSISTENT RECORD SELECTION FOR THE RISK ASSESSMENT OF NPP COMPONENTS N. Sipcic, P.A. De Quevedo IƱarritu, M. Kohrangi, P. Bazzurro | |||||||
09:53 - 10:04 | SEISMIC RESPONSE PREDICTION OF AN ADVANCED GAS-COOLED REACTOR CORE MODEL WITH DEGRADED COMPONENTS T. Gokce, A. Crewe, R.E. White, M. Dietz, T. Horseman, L. Dihoru | |||||||
10:04 - 10:15 | SOME REMARKS ON FRAGILITY CURVES DERIVED USING ALTERNATIVE PROBABILISTIC DEMAND MODELS D. Skoulidou, X. Romao | |||||||
MONITOR 24 | Convenors: D. Vamvatsikos, P. Bazzurro, I. Zentner | ||||||||
10:30 - 10:33 | INTRODUCTION | |||||||
10:33 - 10:45 | A SIMPLIFIED AND EFFICIENT METHOD FOR SEISMIC HAZARD ANALYSIS B. Li, Z. Cai | |||||||
10:45 - 10:57 | RIGOROUS BAYESIAN APPROACH TO DEVELOP MAXIMUM MAGNITUDES DISTRIBUTIONS FOR PSHA COMPUTATIONS I. Zentner, E. Viallet | |||||||
10:57 - 11:09 | EVALUATION OF AFTERSHOCKS IMPACT ON SEISMIC SAFETY OF POWER PLANTS BASED ON EXPERIENCE FEEDBACK S. Fathabadi, H. Sadegh-Azar | |||||||
11:09 - 11:21 | IMPLEMENTATION AND BENCHMARKING OF CS APPROACH(ES) FOR NUCLEAR SAFETY ASSESSMENTS I. Zentner, M. Talaat, M. Pagani, P. Bazzurro | |||||||
11:21 - 11:33 | FROM PGA TO ANYTHING: FRAGILITY CURVE CONVERSIONS FOR NUCLEAR POWER PLANT APPLICATIONS N.D. Karaferis, A.V. Gerontati, D. Vamvatsikos | |||||||
11:33 - 11:45 | THE IMPACT OF SEISMIC INTENSITY MEASURES ON THE NUMBER OF REQUIRED RECORDS FOR TIME HISTORY ANALYSIS M. Zouatine, S.M. Nabizadeh, H. Sadegh-Azar | |||||||
MONITOR 25 | Convenors: D. Vamvatsikos, P. Bazzurro, I. Zentner | ||||||||
10:30 - 10:33 | INTRODUCTION | |||||||
10:33 - 10:45 | A BARE-BONES NUCLEAR POWER PLANT CASE STUDY TO TEST UNCERTAINTY PROPAGATION AND CORRELATION EFFECTS A. Gerontati, N. Karaferis, D. Vamvatsikos, P. Bazzurro, C. Droszcz | |||||||
10:45 - 10:57 | FRAGILITY MODELING OF NUCLEAR POWER PLANTS' COMPONENTS: INTENSITY MEASURES AND ANALYSIS SET-UP G. Triantafyllou, I. Zentner, M. Kohrangi, A. Khemakhem, V. Alves-Fernandes, P. Bazzurro | |||||||
10:57 - 11:09 | SEISMIC RISK OF NON-CONFORMING STEEL STRUCTURES-PRELIM. ASSESSMENT OF THE SHIP DECAY VESSEL AT CERN F. Bonnes, A. Miano, A. Fiorillo, A. Prota, M. Andreini, R. Jacobsson | |||||||
11:09 - 11:21 | BASE ISOLATION SOLUTIONS IN THE SEISMIC RISK ASSESSMENT OF NUCLEAR POWER PLANTS G. Attanasi, D. Kurmann | |||||||
11:21 - 11:33 | TEST BASED CAPACITY AND UNCERTAINTY ASSESSMENT FOR SEISMIC FRAGILITY ANALYSIS OF ELECTRICAL COMPONEN I. Choi, J. Jeong, D. Park, S. Jang | |||||||
11:33 - 11:45 | LEAKAGE RATE EXPERIMENTS OF REINFORCED CONCRETE WALLS Y. Lee, H.-. Park |